Irawan, Dotty Andrew (2005) Perencanaan Konstruksi Mesin Pemarut Ganyong dengan Kapasitas Produksi 100kg/jam. Tugas Akhir thesis, Institut Teknologi Nasional Malang.
Text
0151077.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (2MB) |
Abstract
Perencanaan Konstruksi Mesin Pemarut Ganyong dengan Kapasitas Produksi 100kg/jam keyword: Ganyong
Item Type: | Thesis (Tugas Akhir) |
---|---|
Uncontrolled Keywords: | keyword: Ganyong |
Subjects: | Engineering > Mechanical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Mesin DIII > Tekniki Mesin DIII(Tugas Akhir) |
Depositing User: | Ms Nunuk Yuli |
Date Deposited: | 14 Feb 2023 02:38 |
Last Modified: | 14 Feb 2023 02:38 |
URI: | http://eprints.itn.ac.id/id/eprint/10690 |
Actions (login required)
View Item |