Irawan, Dotty Andrew (2005) Perencanaan Konstruksi Mesin Pemarut Ganyong dengan Kapasitas Produksi 100kg/jam. Tugas Akhir thesis, Institut Teknologi Nasional Malang.
|
Text
0151077.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (2MB) |
Abstract
Perencanaan Konstruksi Mesin Pemarut Ganyong dengan Kapasitas Produksi 100kg/jam keyword: Ganyong
| Item Type: | Thesis (Tugas Akhir) |
|---|---|
| Uncontrolled Keywords: | keyword: Ganyong |
| Subjects: | Engineering > Mechanical Engineering |
| Divisions: | Fakultas Teknologi Industri > Teknik Mesin DIII > Tekniki Mesin DIII(Tugas Akhir) |
| Depositing User: | Ms Nunuk Yuli |
| Date Deposited: | 14 Feb 2023 02:38 |
| Last Modified: | 14 Feb 2023 02:38 |
| URI: | http://eprints.itn.ac.id/id/eprint/10690 |
Actions (login required)
![]() |
View Item |
