Analysis of Operational Delay and Additional Investment Costs, As An Investment Consideration (Case In Malang Pandaan Toll Road)

Yunanda, Dina and Utomo, Christiono and Wijayaningtyas, Maranatha (2020) Analysis of Operational Delay and Additional Investment Costs, As An Investment Consideration (Case In Malang Pandaan Toll Road). International Journal of Entrepreneurship and Business Development, 3 (2). ISSN 2597-4785

[img] Text
ilovepdf_merged (1).pdf

Download (1MB)
[img] Text
Analysis Operational Delay_turnitin.pdf

Download (3MB)
[img] Text
Lembar Peer Review_The Operational Delay.pdf

Download (200kB)

Abstract

This paper aims to Analysis of Operational Delay and Additional Investment Costs, As an Investment Consideration: Case in Malang Pandaan Toll Road. Design/methodology/approach: The method used is statistic-descriptive and the design used is cross sectional. Findings: 2 hypotheses are while the other is accepted. Research limitations/implications: Variables considered in this study are electronic word of mouth, brand image, brand trust, and interest in saving. The scope of work of the Pandaan Malang Toll Road project has a length of 38 + 488 km, passing through two regions in Figure 1. Practical implications: Results show that from the 2 hypotheses proposed. Originality/value: This paper is original. Paper type: This paper can be categorized as a case study

Item Type: Article
Uncontrolled Keywords: brand image; brand trust; electronic word of mouth; saving interest
Subjects: Engineering > Civil Engineering
Divisions: Program Pasca Sarjana > Teknik Sipil S2
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 16 Mar 2023 07:38
Last Modified: 28 Mar 2023 01:44
URI: http://eprints.itn.ac.id/id/eprint/10726

Actions (login required)

View Item View Item