ANALISA FAKTOR KETERLAMBATAN TERHADAP PENGALAMAN KONTRAKTOR MENGERJAKAN PROYEK KONSTRUKSI DI KEDIRI

EKO SETIAWAN, WAHYU (2012) ANALISA FAKTOR KETERLAMBATAN TERHADAP PENGALAMAN KONTRAKTOR MENGERJAKAN PROYEK KONSTRUKSI DI KEDIRI. Skripsi thesis, ITN malang.

[img] Text
0521059.pdf

Download (5MB)

Abstract

ANALISA FAKTOR KETERLAMBATAN TERHADAP PENGALAMAN KONTRAKTOR MENGERJAKAN PROYEK KONSTRUKSI DI KEDIRI

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: ANALISA FAKTOR KETERLAMBATAN TERHADAP PENGALAMAN KONTRAKTOR MENGERJAKAN PROYEK KONSTRUKSI DI KEDIRI
Subjects: Engineering > Civil Engineering
Divisions: Fakultas teknik Sipil dan Perencanaan > Teknik Sipil S1 > Teknik Sipil S1(Skripsi)
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 19 May 2023 03:40
Last Modified: 19 May 2023 03:40
URI: http://eprints.itn.ac.id/id/eprint/11738

Actions (login required)

View Item View Item