SANTOSA, NATHANIO UNGGUL (2023) ANALISIS UNJUK KERJA SISTEM PROTEKSI BUSBAR PADA GARDU INDUK 150 KV KIS SIDOARJO. Skripsi thesis, Institut Teknologi Nasional Malang.
Text
1812079_BAB I.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (84kB) |
|
Text
1812079_BAB II.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (332kB) | Request a copy |
|
Text
1812079_BAB III.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (182kB) | Request a copy |
|
Text
1812079_BAB IV.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (780kB) | Request a copy |
|
Text
1812079_BAB V.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (73kB) | Request a copy |
|
Text
1812079_DAFTAR PUSTAKA.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (73kB) |
|
Text
1812079_LAMPIRAN.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (407kB) | Request a copy |
|
Text
1812079_COVER (1).pdf Download (817kB) |
Abstract
ABSTRACT Performance Analysis of Busbar Protection System at 150 KV KIS Sidoarjo Substation Nathanio Unggul Santosa, NIM : 1812079 Supervisor 1 : Prof. Dr. Eng. Ir. I Made Wartana, MT. Supervisor 2: Awan Uji Krismanto. ST., MT.,Ph.D Busbar is a main part in a substation that functions as the connection point for all bays in the KIS Sidoarjo substation, both line bays and transformer bays. The KIS Sidoarjo substation is designed with a double busbar configuration. Therefore, it is very possible for disturbances to occur on the busbar. Disturbances on the busbar can impede the process of distributing electrical energy to consumers. Therefore, a reliable protection system is needed to protect the busbar from disturbances. This research aims to analyze the protection system of a 150 KV double busbar using a differential relay. Power flow and disturbance current in the KIS Sidoarjo substation in this study were analyzed using loadflow and short circuit simulations using the Etap software. The calculation of current as the basis for designing and setting the differential relay as a busbar protection is done using the Merz Price method, which compares all the incoming and outgoing currents from the protected equipment to one another. The protection relay setting value on the busbar is in accordance with the IEEE 242-2001 standard, which has a minimum sensitivity of 50%. The differential relay current setting on the busbar is 0.26 A. The differential relay setting time on the busbar protection system is 3.8 s. Keywords: Busbar, Relay, Setting
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Nathanio Unggul Santosa (1812079) |
Uncontrolled Keywords: | Busbar, Rele, Setting |
Subjects: | Engineering > Electrical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi) |
Depositing User: | NATHANIO UNGGUL SANTOSA |
Date Deposited: | 19 Jul 2024 07:00 |
Last Modified: | 30 Jul 2024 06:48 |
URI: | http://eprints.itn.ac.id/id/eprint/14616 |
Actions (login required)
View Item |