Zebua, Margaret Nasrani (2014) Pra Rencana Pabrik Etilbenzena (C8H10) Dari Etilena (C2H4) Dan Banzena (C6H6) Dengan Proses Mobil-Badger Kapasitas 16.500 Ton/Tahun. Skripsi thesis, ITN MALANG.
Text
1014001.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (4MB) |
Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | Engineering > Chemical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Kimia S1 > Teknik Kimia S1(Skripsi) |
Depositing User: | Ms Retno Wulan sari |
Date Deposited: | 11 Feb 2019 04:26 |
Last Modified: | 13 Mar 2019 00:43 |
URI: | http://eprints.itn.ac.id/id/eprint/1512 |
Actions (login required)
View Item |