Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda

NORFIRDAUS, NORFIRDAUS and Mulyadi, Lalu and Iskandar, Tiong (2017) Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda. Journal of Engineering Research and Application, 7 (9). ISSN 248-9622

[img] Text
J0709095357.pdf

Download (397kB)
[img] Text (Uji Plagiasi)
10. Lamp. III.A.3c-1.pdf

Download (1MB)
[img] Text (Pereview)
11.pdf

Download (378kB)

Abstract

The construction project will achieve success if the parties were able complete the construction project accordance schedule, safety, cost and quality, heve been established. Many cases delays construction building in Samarinda city, making those a new problem that must be handled and may result in many programs dormant. With thoso conditions, this research to identify and analyze the factors of delay construction building where these are the first step to success support of development projects. This research uses descriptive survey method. The purpose of this research, which describe a number of variables relating to the issue and studied the phenomenon. In this research the techniques to collect research data by questionnaire as an instrument to answer a set of questions or a written statement to the respondent. The goal this research is to obtain a complete description and depth. Case study data obtained from the primary data (questionnaire) and secondary data. Based on the research results, obtained F count > F table, it means the material factors, labor, equipment, finance, environment, government policy changes, contracts, scheduling and control, with simultan and partially technic are positiv influenced and significan to delays in construction building Dinas Cipta Karya dan Tata Kota Bina Marga in Samarinda. Based on the results of multiple regression obtained standardized koefisien β the material factors is 0.456, its mean that factors influence dominan to delay building projects Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda.

Item Type: Article
Uncontrolled Keywords: Delay factors construction building
Subjects: Engineering > Architectural Engineering
Divisions: Fakultas teknik Sipil dan Perencanaan > Teknik Arsitektur S1
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 22 May 2019 04:19
Last Modified: 04 Jul 2019 03:20
URI: http://eprints.itn.ac.id/id/eprint/3531

Actions (login required)

View Item View Item