Analysis Of Scheduling Acceleration Of Worship Building Construction In Dili Timor-Leste Using Time Cost Trade Off (TCTO) Method

Maia, Jaime Ximenes Soares and Mulyadi, Lalu and Putanto, Edi Hargono Dwi (2018) Analysis Of Scheduling Acceleration Of Worship Building Construction In Dili Timor-Leste Using Time Cost Trade Off (TCTO) Method. INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH, 7 (2). ISSN 2277-8616 56

[img] Text
Analysis-Of-Scheduling-Acceleration-Of-Worship-Building-Construction-In-Dili-Timor-leste-Using-Time-Cost-Trade-Off-tcto-Method.pdf

Download (1MB)
[img] Text (Ujiplagiasi)
14. Lamp. III.A.3c-5.pdf

Download (1MB)
[img] Text (Pereview)
15.pdf

Download (383kB)
Official URL: http://www.ijstr.org

Abstract

Planning is the most significant part to achieve success of construction project. The planning itself towards construction project has an impact on revenue in the project itself. Frequently, a project must be completed sooner than its normal time. In this case, the project leader is expected to issue how to accelerate the completion of the project with a minimum cost. The objectives that are expected to achieve from this research are: 1) analyzing the normal time scheduling?, 2) analyzing the scheduling acceleration of the development 3) analyzing changes in the cost increase in development. From the acceleration with time cost trade off (TCTO) method on a worship building project in Dili Timor-Leste, it is optimum to be able to reduce the time duration by adding resources/working groups, and having project cost increase. In the worship building construction project in Dili Timor-Leste, the initial duration of the project is 223 days and it is changed to 181 days, so that there are 34 days of difference from the normal schedule of the project. Where under normal schedule condition, the normal cost obtained is $377.552.868, thus after doing acceleration analysis with time cost trade off (TCTO) method on the project, there is an additional direct cost in the project of $1.123,08 so that the total project cost is $ 378.675,95.

Item Type: Article
Uncontrolled Keywords: acceleration, building, time cost trade
Subjects: Engineering > Architectural Engineering
Institut Teknologi Nasional Malang > Fakultas Teknologi Industri > Architectural Engineering
Divisions: Fakultas teknik Sipil dan Perencanaan > Teknik Arsitektur S1
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 23 May 2019 01:44
Last Modified: 04 Jul 2019 04:30
URI: http://eprints.itn.ac.id/id/eprint/3534

Actions (login required)

View Item View Item