Kuncahyo, Mochamad Dwi (2017) ANALISIS SETTING GROUND FAULT RELAY (GFR) TERHADAP SISTEM PENTANAHAN NETRAL TRANSFORMATOR MENGGUNAKAN METODE NEUTRAL GROUNDING RESISTOR (NGR) PADA PENYULANG PLN RAYON KUALA PEMBUANG. Skripsi thesis, Institut Teknologi Nasional Malang.
Text
File Lengkap Skripsi Perpus.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (2MB) |
Abstract
ABSTRAK ANALISIS SETTING GROUND FAULT RELAY (GFR) TERHADAP SISTEM PENTANAHAN NETRAL TRANSFORMATOR MENGGUNAKAN METODE NEUTRAL GROUNDING RESISTOR (NGR) PADA PENYULANG PLN RAYON KUALA PEMBUANG Mochamad Dwi Kuncahyo, NIM : 1312050 Dosen Pembimbing I : Ir. Yusuf Ismail Nakhoda, MT Dosen Pembimbing II : Ir. Ni Putu Agustini, MT Terdapat banyak sekali gangguan pada jaringan distribusi seperti hubung singkat 3 fasa ke tanah, satu fasa ke tanah, hubung singkat dua fasa dan hubung singkat dua fasa ke tanah. Salah satunya yang sering terjadi pada sistem 20 kV Rayon Kuala Pembuang yaitu hubung singkat 1 fasa ke tanah. Sistem pengamanan yang digunakan untuk mengisolasi gangguan yaitu penggunaan rele Ground Fault Relay (GFR) dimana GFR tidak dapat bekerja jika tidak ada sistem pentanahan netralnya. Penggunaan pentanahan netral solid dan Neutral Grounding Ressistor (NGR) digunakan dalam penelitian ini guna mengetahui setting rele yang tepat ketika terjadi gangguan 1 fasa ke tanah serta melakukan perbandingan antara sistem pentanahan netral yang digunakan dalam setting rele GFR. Hasil analisa hubung singkat dengan pentanahan solid diketahui arus gangguan maksimum sebesar 0,694 kA, sedangkan dengan pentanahan NGR diketahui arus gangguan maksimum sebesar 0,510 kA. Setting waktu kerja rele yang didapat dari sistem pentanahan solid yaitu 0,4 s pada KLP 1 dan 0,29 s pada KLP 2. Setting waktu kerja rele yang didapat dari sistem pentanahan NGR yaitu 0,29 s pada KLP 1 dan 0,302 s pada KLP 2. Dalam hal ini penggunaan NGR lebih efektif sebagai pentanahan netral karena bisa mereduksi besar arus hubung singkat yang terjadi sehingga tidak membahayakan peralatan dan manusia di sekitar. Kata kunci : Ground Fault Relay (GFR), Solid, Neutral Grounding Resistor (NGR) iii ABSTRACT ANALYSIS OF GROUND FAULT RELAY (GFR) SETTING ON GROUND NEUTRAL TRANSFORMER SYSTEM USING NEUTRAL GROUNDING RESISTOR (NGR) METHOD ON PLN FEEDER OF KUALA PEMBUANG Mochamad Dwi Kuncahyo, NIM : 1312050 Lecturer I : Ir. Yusuf Ismail Nakhoda, MT Lecturer II : Ir. Ni Putu Agustini, MT There are many fault at the distribution network such as 3 phase short circuit to ground, one phase to ground, short circuit of two phases and short circuit of two phases to the ground. One of them is often happened on 20 kV Sector of Kuala Pembuang system that is short circuit one phase to the ground. The security system used to isolate the fault is the use of the Relay Fault Relay (GFR) where GFR can not work properly if there is no neutral grounding system. The use of a solid neutral ground and a Neutral Grounding Ressistor (NGR) was used in this study to determine the proper setting of relay when a one phase to ground phase fault happened and to compare the neutral grounding system used in the GFR release settings. The result of short circuit analysis with solid ground is known the maximum fault current is 0,694 kA, and with NGR grounding it is known that the maximum fault current is 0,510 kA. Setting the working time of relay obtained from solid grounding system that is 0.4 s at KLP 1 and 0.29 s on KLP 2. Setting the working time of relay obtained from the NGR grounding system that is 0.29 s at KLP 1 and 0.302 s on the KLP 2. In this case the use of NGR is more effective as a neutral grounding because it can reduce the large short-circuit current that occurs so as not to harm the equipment and humans around. Keyword : Ground Fault Relay (GFR), Solid, Neutral Grounding Resistor (NGR)
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Mochamad Dwi Kuncahyo, NIM : 1312050 |
Uncontrolled Keywords: | Ground Fault Relay (GFR), Solid, Neutral Grounding Resistor (NGR) |
Subjects: | Engineering > Electrical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi) |
Depositing User: | Ms Nunuk Yuli |
Date Deposited: | 16 Sep 2019 07:16 |
Last Modified: | 16 Sep 2019 07:16 |
URI: | http://eprints.itn.ac.id/id/eprint/4184 |