Prasetyo, Stefan Anugerah (2019) INVESTIGASI PENGARUH PEMBANGKIT LISTRIK TENAGA BAYU “On Grid” TERHADAP KESTABILAN TEGANGAN PADA SISTEM KELISTRIKAN SULAWESI SELATAN BARAT (SulSelBar). Skripsi thesis, Institut Teknologi Nasional Malang.
Abstract
INVESTIGASI PENGARUH PEMBANGKIT LISTRIK TENAGA BAYU “On Grid” TERHADAP KESTABILAN TEGANGAN PADA SISTEM KELISTRIKAN SULAWESI SELATAN BARAT (SulSelBar) Stefan Anugerah Prasetyo Awan Uji Krismanto stefananugerah@gmail.com ABSTRAK Perubahan beban yang bervariatif berdampak pada kestabilan sistem. Perubahan yang signifikan dapat menyebabkan sistem melebihi dari batas stabil, hal ini akan mengakibatkan pemasukan lebih listrik meningkat tajam sehingga mengharuskan pihak penyedia jasa layanan listrik untuk menambah kapasitas pembangkit.ketersiadaan pasokan listrik untuk para konsumen menjadi tujuan utama pada sistem interkoneksi agar tidak menyebabkan melemahnya stabilitas performa sistem. Seperti pada system transmisi Sulawesi Selatan – Barat, yang mengalami kritis pada bus 31 Tonasa yang memiliki profil tegangan di bawah 0,945. Untuk mengatasi hal ini , telah di bangun Pembangkit Listrik Tenaga Bayu (PLTB) dengan metode Full Rated di 2 bus yaitu bus 9 Janeponto sebesar 72 MW dan bus 28 Sidrap sebesar 75 MW. Maka, pada penelitian ini akan membahas tentang pengaruh PLTB tersebut terhadap system transmisi Sulawesi Selatan – Barat. Jika pengaruh PLTB tersebut tidak berdampak banyak pada profil tegangan , maka akan di lakukan penambahan kapasitor di bus 31 Tonasa sebesar 32 Mvar. Setelah dilakukannya pemasangan PLTB dan kapasitor , terbukti profil tegangan pada bus 31 Tonasa yang sebelumnya kritis yakni 0,901 p.u setelah di pasang PLTB dan Kapasitor menjadi 0,951 p.u Kata Kunci— Perubahan beban, profil tegangan, pembangkit Listrik Tenaga Bayu , Kapasitor. 3 INVESTIGATION OF THE EFFECT OF "On Grid" POWER PLANT IN VOLTAGE STABILITY IN WEST SOUTH SULAWESI ELECTRICITY SYSTEM Stefan Anugerah Prasetyo Awan Uji Krismanto stefananugerah@gmail.com ABSTRACT Changes in the variation of the load have an impact on the stability of the system. Significant changes can cause the system to exceed the stable limit, this will cause more electricity to increase sharply, thus requiring the electricity service provider to increase generating capacity. The absence of electricity supply for consumers is the main goal of the interconnection system so as not to cause weak performance stability system. As in the South-West Sulawesi transmission system, which experienced critical conditions on the 31 Tonasa bus which has a voltage profile below 0.945. To overcome this, the Bayu Power Plant (PLTB) has been built with the Full Rated method on 2 buses, namely the 9 Janeponto bus at 72 MW and the 28 Sidrap bus at 75 MW. So, this research will discuss about the effect of the PLTB on the South-West Sulawesi transmission system in terms of static voltage stability and dynamic voltage stability. If the PLTB effect is not able to improve voltage stability, the solution will be to add capacitors to the bus who experienced the critical. Keywords — Load change, voltage profile, Wind Power Plant, Capacitors.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Stefan Anugerah Prasetyo 15.12.030 |
Uncontrolled Keywords: | Perubahan beban, profil tegangan, pembangkit Listrik Tenaga Bayu , Kapasitor. |
Subjects: | Engineering > Electrical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi) |
Depositing User: | Ms Nunuk Yuli |
Date Deposited: | 23 Sep 2019 06:48 |
Last Modified: | 23 Sep 2019 06:48 |
URI: | http://eprints.itn.ac.id/id/eprint/4260 |
Actions (login required)
View Item |