Hidayat, Sutanto and Iskandar, Tiong and Limpraptono, Yudi and Wijayaningtyas, Maranatha (2019) HEAVY EQUIPMENT EFFICIENCY, PRODUCTIVITY AND COMPATIBILITY OF COAL MINE OVERBURDEN WORK IN EAST KALIMANTAN. International Journal of Mechanical Engineering and Technology (IJMET, 10 (6). ISSN 0976-6359 (Submitted)
Text
heavy quipment.pdf Download (323kB) |
|
Text (ujiplagiasi)
HEAVY EQUIPMENT EFFICIENCY, PRODUCTIVITY AND COMPATIBILITY OF COAL MINE OVERBURDEN WORK IN EAST KALIMANTAN.pdf Download (3MB) |
|
Text (Peereview)
6 peereview Heavy Equipment006.pdf Download (361kB) |
|
Text (Uji turnitin)
HEAVY EQUIPMENT EFFICIENCY, PRODUCTIVITY AND COMPATIBILITY OF COAL MINE OVERBURDEN WORK IN EAST KALIMANTAN.pdf Download (2MB) |
|
Text
Peer Review_Heavy Equipment_signed.pdf Download (520kB) |
Abstract
A mining activity starts with clearing the land from plants and overburden stripping. The purpose of this study is to analyze the value of work efficiency, productivity, and compatibility of heavy equipment in overburden work. This research employs a descriptive method and includes a case study, then the data were obtained from observations. The research results found that the value of workload efficiency is 74.63% and the value of conveyance is 58.37%; while the productivity of loading equipment is 5,055 BCM/hour and conveyance is 5,189 BCM/hour; furthermore, the match factor level of the equipment is 0.65. However, the match factor level is still below the standard. Thus, further research is required to determine the appropriate strategy to make the equipment's match factor level equal to one.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | work efficiency, productivity, coal, heavy equipment, overburden |
Subjects: | Engineering > Industrial Engineering |
Divisions: | Program Pasca Sarjana > Teknik Industri S2 |
Depositing User: | Mr Sayekti Aditya Endra |
Date Deposited: | 28 Nov 2019 03:35 |
Last Modified: | 18 Nov 2022 03:38 |
URI: | http://eprints.itn.ac.id/id/eprint/4491 |
Actions (login required)
View Item |