Cahyono, Henry (2006) Analisis Prakiraan beban jangka pendek menggunakan metode predictive modular neural Network di gardu induk Ngagel Surabaya. Skripsi thesis, ITN MALANG.
Text
0112153.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (7MB) |
Abstract
one of especial component operation and planning electric power system is short term load foresacting that is prediction requirement of electrics burden dor a few hour till next few days. acccurary prediction to have economic impact to company of electrics
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | Predictiv emodular neutal network |
Subjects: | Engineering > Electrical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi) |
Depositing User: | Mr Sayekti Aditya Endra |
Date Deposited: | 07 Feb 2022 03:18 |
Last Modified: | 07 Feb 2022 03:18 |
URI: | http://eprints.itn.ac.id/id/eprint/6959 |
Actions (login required)
View Item |