ANALISA KOORDINASI SETTING TIME RELAY ARUS LEBIH DENGAN MENGGUNAKAN SIMULASI PERANGKAT LUNAK ETAP POWERSTATION PADA SALURAN DISTRIBUSI 20 kV DI GI KEBONAGUNG

RAHMA, ANDITYA EKA (2009) ANALISA KOORDINASI SETTING TIME RELAY ARUS LEBIH DENGAN MENGGUNAKAN SIMULASI PERANGKAT LUNAK ETAP POWERSTATION PADA SALURAN DISTRIBUSI 20 kV DI GI KEBONAGUNG. Skripsi thesis, ITN Malang.

[img] Text
0112023.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (4MB)

Abstract

ANALISA KOORDINASI SETTING TIME RELAY ARUS LEBIH DENGAN MENGGUNAKAN SIMULASI PERANGKAT LUNAK ETAP POWERSTATION PADA SALURAN DISTRIBUSI 20 kV DI GI KEBONAGUNG

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: TIME RELAY,ARUS , SIMULASI PERANGKAT LUNAK ETAP POWERSTATION
Subjects: Engineering > Electrical Engineering
Divisions: Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi)
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 27 May 2022 01:11
Last Modified: 27 May 2022 01:11
URI: http://eprints.itn.ac.id/id/eprint/8284

Actions (login required)

View Item View Item