Analysis to Factors Affecting Contractor Work Performance to Quality of Road Improvement Projects in Probolinggo Regency

Lyanawati, Yuli Maria and Mulyadi, Lalu and Wulandari, Lies Kurniawati and Hidayat, Sutanto and Maranatha, Wijayaningtyas (2022) Analysis to Factors Affecting Contractor Work Performance to Quality of Road Improvement Projects in Probolinggo Regency. Journal of Architecture and Civil Engineering, 7 (6). ISSN 2321-8193

[img] Text
Road Improvement.pdf

Download (417kB)
[img] Text
Road Improvement_Turnitin.pdf

Download (2MB)
[img] Text
Peer Review_Analysis Road Improvement_signed.pdf

Download (524kB)

Abstract

Road improvement project in Probolinggo Regency in its implementation is expected to be carried out by a good contractor so it can produce a high quality road improvement which will be in line with people expectation from several aspects such as time, right quality and right in cost. However, all of those aspects depend on the work performance from the contractor who provide services expertise for the owner of the project. Related to this matter, many contractors have not carried out their duties properly and correctly as expected; therefore, this research is conducting to find out the cause. The research employs a survey method by collecting opinions, experiences, and attitudes of respondents regarding existing problems, by taking primary data through questionnaries and secondary data from related institutions. From many influencial factors to the contractors’ work performance on the quality of road improvement project in Probolinggo Regency, then the factors were identified, determined, and followed by determining variables to be applied as measurable questions for the questionnaire format. The result of the study found that there are 10 (ten) variables to be used as questions for measuring indicators that affect the contractors’ work performance on the quality of road improvement project, where one of the most dominant variables found was the motivation variable (X1) by a standard coefficient of 0.494.

Item Type: Article
Uncontrolled Keywords: Contractor Work performance, Project Quality, Road Improvement, Probolinggo Regency
Subjects: Engineering > Civil Engineering
Divisions: Program Pasca Sarjana > Teknik Sipil S2
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 18 Nov 2022 03:36
Last Modified: 18 Nov 2022 03:36
URI: http://eprints.itn.ac.id/id/eprint/9586

Actions (login required)

View Item View Item