Risk Analysis To Determine Schedules And Reduce Maintenance Costs In Elevators With Fmea, Qfd, And Markov Chain Methods

Priambodo, Bambang and Nursanti, Ellysa and Laksmana, Dimas Indra (2021) Risk Analysis To Determine Schedules And Reduce Maintenance Costs In Elevators With Fmea, Qfd, And Markov Chain Methods. Risk Analysis To Determine Schedules And Reduce Maintenance Costs In Elevators With Fmea, Qfd, And Markov Chain Methods, 10 (08). pp. 89-92. ISSN 2277-8616

[img] Text
6b Risk Analysis To Determine Schedules And Reduce Maintenance Costs In Elevators With Fmea, Qfd, And Markov Chain Methods.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (482kB)
[img] Text
6a Turnitin Risk Analysis To Determine Schedules And Reduce Maintenance Costs In Elevators With Fmea, Qfd, And Markov Chain Methods.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[img] Text
6c Risk Analysis To Determine Schedules And Reduce Maintenance Costs In Elevators With Fmea, Qfd, And Markov Chain Methods.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (103kB)

Abstract

: PT. Balistha Gapala Nandya is a service company engaged in the procurement and maintenance of elevators (travelators), escalators, elevators. The company is the only authorized distributor in Indonesia that has been certified by The Fuji HD Elevator Sino Japan Joint Venture. PT. Balistha Gapala Nandya is a service company engaged in elevators (elevators) both procurement and maintenance and has a maximum cost (maintenance) limit of IDR 50,000,000 for 1 elevator unit. Based on actual conditions in the field of PT. Balistha Gapala Nandya implements corrective maintenance. The maintenance issued by the company is IDR 64,990,000, which means it has passed the maximum limit of the company's maintenance costs. The purpose of this research is to reduce the risk value in the elevator, get a maintenance schedule that can reduce the risk of damage and reduce / save maintenance costs. Data collection is done by obtaining primary data, namely the number of machines categorized according to the condition of the damage and secondary data, namely written data on elevator maintenance in 2019. The methods used in this study are the FMEA, QFD and Markov Chain methods. The results of the research get the proposed P3 maintenance scheduling (preventive on minor and moderate damage, corrective for heavy damage) as routine maintenance every month with a cost savings of 41%. Index Terms : FMEA, Markov, Maintenance, Maintenance Scheduling, QFD, Ris

Item Type: Article
Uncontrolled Keywords: : FMEA, Markov, Maintenance, Maintenance Scheduling, QFD, Risk
Subjects: Engineering > Industrial Engineering
Divisions: Program Pasca Sarjana > Teknik Industri S2
Depositing User: Ms Nunuk Yuli
Date Deposited: 12 Dec 2022 08:46
Last Modified: 12 Dec 2022 09:04
URI: http://eprints.itn.ac.id/id/eprint/9687

Actions (login required)

View Item View Item