Up a level |
Pangestu, Robi Siswo and Wulandari, Lies Kurniawati and Setyobudiarso, Herry (2020) Analysis Of The Implementation Of Building Information Modeling For Time Control And The Implamation Methode Of Water Way Tunnel Construction In Way APU DAM, Buru District. INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH, 9 (11). pp. 278-283. ISSN 2277-8616 56
Pangestu, Robi Siswo (2018) ANALISA STRUKTUR LAPISAN HARD CHROME PADA BAJA AISI D2 TERHADAP WAKTU PROSES ELECTROPLATING. Skripsi thesis, Institut Teknologi Nasional Malang.