Up a level |
Zuhdi, Ahmad (2023) ANALISIS OPTIMALISASI WAKTU DAN BIAYA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GEDUNG ASRAMA SISWA TERPADU MTsN 1 KOTA MALANG. Masters thesis, Institut Teknologi Nasional Malang.
Zuhdi, Ahmad and Mulyadi, Lalu and Maringka, Breeze (2022) A Risk Management Analysis on Project Construction of Integrated Student Dormitory Building MTSN 1 Malang City. Quest Journals Journal of Architecture and Civil Engineering, 7 (6). ISSN 2321-8193