Up a level |
Anshari, M (2012) ANALISA PENJADWALAN PEMBANGUNAN GEDUNG MARKAS KOMANDO SARANA PRASARANA POLDA KALIMANTAN SELATAN BANJARMASIN MENGGUNAKAN METODE TIME COST TRADE OFF ANALYSIS (TCTO). Masters thesis, Itn Malang.
BASRIANSYAH, BASRIANSYAH (2012) PRODUKTIVITAS TENAGA KERJA UNTUK PASANGAN BATU BATA RINGAN PADA PEMBANGUNAN CONDOTEL TOWER 2 THE GRAND BANUA DI BANJARMASIN KALIMANTAN SELATAN. Masters thesis, ITN Malang.
Irwanto, Taurina Jemmy (2012) ANALISIS RISIKO INVESTASI ASPHALT MIXING PLANT (AMP) (STUDI KASUS PT.DUA PUTRI KEDATON DI KABUPATEN PAMEKASAN). Masters thesis, ITN Malang.
Noor, Ade Surya jaya (2012) ANALISA PRODUKTIVITAS TENAGA KERJA HARIAN UNTUK PEKERJAAN ATAP BAJA RINGAN PADA PROYEK BANGUNAN KANTOR DI KABUPATEN BALANGAN KALIMANTAN SELATAN. Masters thesis, ITN Malang.
Rakhmawati, Ika yulia (2012) ESTIMASI BIAYA PEMELIHARAAN JALAN DENGAN COST SIGNIFICANT MODEL (STUDI KASUS HOTMIX/ HRS KABUPATEN DI KABUPATEN PAMEKASAN) OLEH IKA YULIA RAKHMAWATI NIM 12.121.038 INSTITUT TEKNOLOGI NASIONAL MALANG PROGRAM PASCASARJANA PROGRAM STUDI TEKNIK SIPIL 2014. Masters thesis, ITN Malang.
sumantri, imam (2012) OPTIMASI BIAYA PROYEK JALAN HOT MIX DENGAN MENGGUNAKAN BEBERAPA ALTERNATIF LOKASI ASPHALT MIXING PLANT. Masters thesis, itn malang.
Wahyudiono, Heri (2012) ANALISA TIDAK TERCAPAINYA UMUR RENCANA JALAN HOTMIX(STUDI KASUS : RUAS JALAN HOTMIX KABUPATEN DI KABUPATEN TULUNGAGUNG JAWA TIMUR). Masters thesis, ITN Malang.