Items where Division is "Program Pasca Sarjana > Teknik Sipil S2 > Teknik Sipil S2(Tesis)" and Year is 2015

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | M | R | S | W | Y
Number of items: 8.

A

Anas, Akhmad (2015) Analisis Faktor-faktor Yang Berpengaruh Terhadap Keterlambatan Proyek Pembangunan Gedung Bertingkat Metode Pracetak Di Jawa Timur (Studi Kasus: Proyek-Proyek Pembangunan Rumah Susun Sederhana Sewa Di Propinsi Propinsi Jawa Timur TA.2013 - 2014). Masters thesis, ITN Malang.

M

M, Syahrizal (2015) ALTERNATIF PEMILIHAN ANTARA KONSTRUKSI BETON PRECAST DAN BETON COR DITEMPAT PADA SALURAN SUB MAKRO DALAM PENANGGULANGAN DEBIT LIMPASAN ( Studi Kasus Daerah Jalan Harun Nafsi Kota Samarinda ). Masters thesis, ITN Malang.

R

Risharnanda, Bambang (2015) ANALISA KELAYAKAN EKONOMI BENDUNGAN SEMANTOK DI KABUPATEN NGANJUK. Masters thesis, itn malang.

S

Safi'i, Ali (2015) ANALISIS RISIKO PENAWARAN UNDERESTIMATE TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI KABUPATEN PROBOLINGGO. Masters thesis, ITN Malang.

Sasongko, Januar (2015) STRATEGI PEMANFAATAN LAHAN PERSIMPANGAN JALAN RAYA KARANGLO KABUPATEN MALANG UNTUK PENGEMBANGAN INSTITUT TEKNOLOGI NASIONAL MALANG PROGRAM PASCA PUSAT PERNIAGAAN. Diploma thesis, ITN Malang.

Sudarmono, Sudarmono (2015) ANALISIS YANG MEMPENGARUHI KINERJA KONTRAKTOR TERHADAP KUALITAS PROYEK-PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO. Masters thesis, ITN Malang.

W

Wahyudi, Lalu Achmad Juniarta Dias Eka (2015) EVALUASI PELAKSANAAN PEMBANGUNAN GEDUNG RESI GUDANG MENGGUNAKAN METODE TIME COST TRADE OFF ANALYSIS (TCTO) (Studi Kasus Proyek Gedung Resi Gudang Kecamatan Tumpang Kabupaten Malang). Masters thesis, ITN Malang.

Y

Yunianto, Henri (2015) ANALISIS FAKTOR-FAKTOR KINERJA KONSULTAN PENGAWAS YANG BERPENGARUH TERHADAP WAKTU DAN MUTU PEKERJAAN PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO. Masters thesis, ITN Malang.

This list was generated on Sat Nov 23 10:18:25 2024 WIB.