Up a level |
Azis, Subandiyah (2016) ANALISIS FAKTOR-FAKTOR KINERJA KONSULTAN PENGAWAS YANG BERPENGARUH TERHADAP WAKTU DAN MUTU PEKERJAAN PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO. ANALISIS FAKTOR-FAKTOR KINERJA KONSULTAN PENGAWAS YANG BERPENGARUH TERHADAP WAKTU DAN MUTU PEKERJAAN PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO, 7 (12). pp. 1-12.
Azis, Subandiyah (2016) Environmental Drainage Systems in the Sukun District, Malang Indonesia. International Journal of Innovations in Engineering and Technology (IJIET), 7 (4). ISSN 2319 - 1058
Azis, Subandiyah and Nurdin, Ali and Putranto, Edi Hargono D. (2016) Application of value engineering on the contruction of tertiary Irrigation channel. Research Journal of applied sciences. ISSN 1819-932X (Submitted)
Azis, Subandiyah and Putranto, Edi Hargono D and Sudarmono, Sudarmono (2016) ANALISIS YANG MEMPENGARUHI KINERJA KONTRAKTOR TERHADAP KUALITAS PROYEK-PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO. Jurnal Info Manajemen Proyek, 7 (2). ISSN 2460-9609 (Submitted)
Azis, Subandiyah and Widodo, Hari (2016) DETERMINATION OF PRIORITY OF THE CONSTRUCTION OF IRRIGATION NETWORK. International Journal of Agricultural Research, Innovation and Technology, 6 (2). ISSN 2224-0616
Lukiyanto, Kukuh (2016) Mandor, Model Kepemimpinan Tradisional Jawa pada Proyek Konstruksi Era Modern. Penerbit PT Gramedia Pustaka Utama, Jakarta. ISBN 978-602-03-2663-4
Mulyadi, Lalu and Hutabarat, Julianus and Harisman, Andi (2016) Relief and Statue SINGOSARI TEMPLE. CV. Dream Litera Buana, Malang. ISBN 978-602-1060-22-3
Sutarti, Sutarti (2016) Analisis Pengendalian Persediaan Bahan Baku Menggunakan Metode Economic Order Quantity Dalam Upaya Meningkatkan Efisiensi (Studi Kasus Pada PT. Pancaran Mulia Sejati). Analisis Pengendalian Persediaan Bahan Baku Menggunakan Metode Economic Order Quantity Dalam Upaya Meningkatkan Efisiensi (Studi Kasus Pada PT. Pancaran Mulia Sejati), 2 (2). pp. 1-5. ISSN 2460-7975