ANALISIS PERCEPATAN PADA PELAKSANAAN PEMBANGUNAN PROYEK RUMAH SAKIT UMUM DAERAH LABUAN BANTEN

DOS SANTOS, JUSTINO (2023) ANALISIS PERCEPATAN PADA PELAKSANAAN PEMBANGUNAN PROYEK RUMAH SAKIT UMUM DAERAH LABUAN BANTEN. Masters thesis, Institut Teknologi Nasional Malang.

[img] Text
21121002_COVER.pdf

Download (482kB)
[img] Text
21121002_BAB I.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (60kB)
[img] Text
21121002_BAB II.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[img] Text
21121002_BAB III.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (306kB) | Request a copy
[img] Text
21121002_BAB IV.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB) | Request a copy
[img] Text
21121002_BAB V.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (32kB) | Request a copy
[img] Text
21121002_DAFTAR PUSTAKA.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (92kB)
[img] Text
21121002_,LAMPIRAN.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB) | Request a copy

Abstract

ABSTRAK Justino Dos Santos, 2023. Program Studi Teknik Sipil, Program Pasca Sarjana, Institute Teknologi Nasional Malang, September 2023, Analisis Percepatan Pada Pelaksanaan Pembangunan Proyek Rumah Sakit Umum Daerah Labuan Banten, Tesis, Pembimbing: (I) Prof. Dr. Ir. Sutanto Hidayat, MT., (II) Dr. Lila A. R. Winanda, St., MT. Pada pembangunan proyek Rumah Sakit Daerah Labuan Banten, sejak awal pekerjaan proyek telah terjadi keterlambat selama satu bulan dikarenakan adanya perubahan desain pada gedung renovasi, perubahannya adalah gedung eksistin dua lantai akan dijadikan 3 lantai. Demikian juga struktur kolom yang lama tidak dirobohkan melainkan menggunakan perkuatan struktur pada kolom, dikarenakan pemilihan perkuatan strukur agar mutunya memenuhi standar yang ada dan juga biayanya menjadi lebih ekonomis serta waktu pengerjaannya juga tidak terlalu lama. Karena adanya keterlambatan tersebut maka peneliti mencoba melakukan percepatan dengan menggunakan dua metode yaitu metode Crashing dan metode fast track yang pada intinya untuk mengoptimasi biaya dan waktu pekerjaan proyek. Hasil penelitian ditemukan bahwa didapat durasi waktu normal untuk pekerjaan struktur pada pelaksanaan Proyek Pembangunana Rumah Sakit Daerah Labuhan Banten adalah 85 hari. Sedangkan dari hasil analisis percepatan pada pekerjaan struktur menggunakan metode Crashing-Fast Track ditemukan waktu 71 hari sehingga selisih waktu normal dan waktu setelah di optimasi dengan penerapan Crashing-Fast Track mendaptkan efisiensi waktu sebanyak 14 hari. Kata kunci : Percepatan Waktu, Proyek Rumah Sakit, Crashing, Fast Track. . ABSTRACT Justino Dos Santos, Civil Engineering Study Program, Postgraduate Program, National Institute Of Technologi Malang, September 2023, The Implementation Of Time Acceleration Analysis To Project Construction Of Labuan Banten Regional Hospital, Thesis, Advisor: (1) Prof. Dr. Ir. Sutanto Hidayat, MT, (II) Dr. Lila A. R. Winanda, St., MT. In the construction of Regional Hospital of Labuan Banten project, from the beginning of project work there has been one month delay due to design changes for the renovation building where the change made in the existing two-storey building that will be transformed into three- storey building. Moreover, the old column structure was not demolished but having a structure reinforcement for the column. A structural reinforcement was chosen to make the quality of building meets the existing standards also with consideration of more economical cost and shorter working time. Due to this delay, the researchers tried to accelerate by employing two methods namely Crashing method and Fast Track method, which essentially were applied to optimize the cost and time of project work. As the research results, the normal time duration for structure work implementation from Regional Hospital of Labuhan Banten Construction Project was 85 days and by the result from acceleration analysis on the structure work by employing the Crashing-Fast Track method, it was found the time duration was 71 days, so, the difference between normal time and optimized time by implementing Crashing-Fast Track methods on structure work resulted a time efficiency of 14 days. Keywords : Time acceleration, Hospital Project, Crashing, Fast Track.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Keywords : Time acceleration, Hospital Project, Crashing, Fast Track.
Subjects: Engineering > Civil Engineering
Divisions: Program Pasca Sarjana > Teknik Sipil S2 > Teknik Sipil S2(Tesis)
Depositing User: Justino Dos Santos
Date Deposited: 25 Sep 2023 06:56
Last Modified: 25 Sep 2023 06:56
URI: http://eprints.itn.ac.id/id/eprint/13248

Actions (login required)

View Item View Item