Soegiarto, Indra (2020) PROBABILISTIK ANALISIS PENGARUH INTEGRASI PEMBANGKIT ENERGI BARU TERBARUKAN TERHADAP PROFIL TEGANGAN PADA JARINGAN TRANSMISI 150kV SULSELBAR. Skripsi thesis, Institut Teknologi Nasional Malang.
Text
1612005-AWAL - indra soegiarto.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (1MB) |
|
Text
1612005-BAB 1 - indra soegiarto(1).pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (155kB) |
|
Text
1612005-BAB 2 - indra soegiarto.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (273kB) | Request a copy |
|
Text
1612005-BAB 3 - indra soegiarto.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (208kB) | Request a copy |
|
Text
1612005-BAB 4 - indra soegiarto.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (1MB) | Request a copy |
|
Text
1612005-BAB 5 - indra soegiarto.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (97kB) | Request a copy |
|
Text
1612005-LAMPIRAN - indra soegiarto.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (6MB) | Request a copy |
Abstract
PROBABILISTIK ANALISIS PENGARUH INTEGRASI PEMBANGKIT LISTRIK TENAGA BAYU TERHADAP PROFIL TEGANGAN PADA JARINGAN TRANSMISI 150kV SULSELBAR Indra Soegiarto, Awan Uji Krismanto, Irrine Budi Sulistiawati isoegiarto10@gmail.com ABSTRAK Perkembangan teknologi yang pesat menyebabkan konsumsi akan daya listrik semakin tinggi. Saat ini sumber daya listrik yang dihasilkan berasal dari pembangkit konvensional yang masih menggunakan batubara. Apabila diteruskan cadangan minyak bumi akan cepat menipis. Oleh karena itu para peneliti terus melakukan pengembangan untuk menciptakan alternatif sumber daya listrik dengan memanfaatkan Energi Baru Terbarukan salah satunya Pembangkit Listrik Tenaga Bayu. Pemasangan PLTB yang beroperasi di kabupaten Sidenreng Rappang ( Sidrap ) dan di kabupaten Jeneponto menjadi solusi untuk memaksimalkan pasokan pada Sistem Kelistrikan Sulawesi Selatan dan Barat, namun hal ini juga memberikan pengaruh terhadap profil tegangan. Studi ini bertujuan untuk menganalisis profil tegangan akibat integrasi PLTB, terutama dengan kecepatan angin yang bervariasi. Studi kasus yang dipilih adalah sistem kelistrikan sulselbar, yang diberikan simulasi probabilistik statistik kecepatan angin untuk melihat pengaruh terhadap profil tegangan. Dari simulasi yang dilakukan, hasil penelitian ini menunjukkan bahwa ketika 1 PLTB terintegrasi dalam sistem mampu memperbaiki profil tegangan, seperti pada bus 31 Tonasa yang mengalami undervoltage mengalami kenaikan sebesar 0,001 - 0,002 p.u. dan ketika 2 PLTB terintegrasi mengalami kenaikan sebesar 0,002 - 0,005 p.u. yang artinya bahwa ketika PLTB diintegrasikan ke dalam sistem mampu memperbaiki profil tegangan. Kata kunci - Integrasi PLTB, Profil Tegangan, Probabilistik Statistik. Probabilistic Analysis on Voltage Profile of Integration Renewable Energy ( Sulselbar 150kV Power System ) Indra Soegiarto, Awan Uji Krismanto, Irrine Budi Sulistiawati isoegiarto10@gmail.com ABSTRACT The rapid development of technology causes the consumption of electricity to be higher. At present the electricity generated from conventional power plants is still using coal. If it is continued, petroleum reserves will quickly run low. Therefore, researchers continue to develop to create alternative electricity resources by utilizing New Renewable Energy, one of which is the Bayu Power Plant. The installation of PLTB which operates in Sidenreng Rappang (Sidrap) district and in Jeneponto district is a solution to maximize supply in the South and West Sulawesi Electricity System, but this also has an influence on the stress profile. This study aims to analyze the voltage profile due to the integration of PLTB, especially with varying wind speeds. The selected case study is the sulselbar electrical system, which is given a probabilistic statistical simulation of wind speed. From the simulations carried out, this study found that when 1 PLTB was integrated in the system it was able to improve the voltage profile, as was the case for the 31 Tonasa bus which experienced an undervoltage which increased by 0.001 - 0.002 p.u. and when 2 integrated PLTB experienced an increase of 0.005 p.u. which means that when the PLTB is integrated into the system it is able to improve the voltage profile. Keywords - Integration of Wind Energy Conversion Systems, Voltage Profile, Probabilistic Statistic.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Indra Soegiarto (1612005) |
Uncontrolled Keywords: | Integration of Wind Energy Conversion Systems, Voltage Profile, Probabilistic Statistic. |
Subjects: | Engineering > Electrical Engineering |
Divisions: | Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi) |
Depositing User: | Ms Nunuk Yuli |
Date Deposited: | 25 Nov 2020 03:58 |
Last Modified: | 25 Nov 2020 03:58 |
URI: | http://eprints.itn.ac.id/id/eprint/5210 |
Actions (login required)
View Item |