Prima Setiawan, Hangga and Mulyadi, Lalu and Nurul Hidayat3, Agustina (2022) The Analysis of Risk Management to Occupational Health Aspect During Covid-19 Pandemic Time In Double Track Railway Projects AT KM 43+800 MOJOKERTO-SEPANJANG to 49+500 SURABYA-SOLO ROUTE. The Analysis of Risk Management to Occupational Health Aspect During Covid-19 Pandemic Time In Double Track Railway Projects AT KM 43+800 MOJOKERTO-SEPANJANG to 49+500 SURABYA-SOLO ROUTE, 7 (8). pp. 1-16. ISSN 2321-8193
Text
2022-the analysis of risk management-nurul.pdf Download (595kB) |
|
Text
The Analysis of Risk Management to Occupational Health Aspect During Covid-19 Pandemic Time In Double Track Railway Projects AT KM 43+800 MOJOKERTO-SEPANJANG to 49+500 SURABYA-SOLO ROUTE.pdf Download (3MB) |
Abstract
Whole world currently experiencing Covid-19 pandemic, with no exception of Indonesia. One of the sectors affected is the construction work. There are many changes must be made to prevent the Covid-19 transmission in the work area, including prevention of Covid-19 at project site for the construction of Southern Java Double Track Railway at KM 43+800 to 49+500 Mojokerto-Sepanjang, Surabaya-Solo route. The study uses a Failure mode and Effect Analysis or known as FMEA method in analyzing risks due to Covid-19 pandemic. From the FMEA results, the risks and mitigation priorities will be obtained which then be analyzed further by employing the Analytical Hierarchy Process (AHP) method to take the final decision. The results of research analysis by FMEA methods are stated as: 1) in K3 system activities, highest variable is below standard equipment for virus transmission prevention in accordance to SOP (with RPN percentage of 60 %), 2) in employees and worker management activities, the highest variable is the undetected virus transmission activity (with RPN percentage of 75%), 3) as the last activity of this study is found in the work method with the highest variable of no physical distancing between workers and the over shift working hours (both activities have the same RPN percentage of 27 %). From the calculation result above, the highest risks lies on the undetected virus Covid-19 transmission which has RPN value of 75 %. KEYWORDS: Risk Management, Covid-19 Failure Mode and Effect Analysis, Analytical Hierarchy Process, Double Track Railway, Southern Java.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | The Analysis of Risk Management to Occupational Health Aspect During Covid-19 Pandemic Time In Double Track Railway Projects AT KM 43+800 MOJOKERTO-SEPANJANG to 49+500 SURABYA-SOLO ROUTE |
Subjects: | Engineering > Area Planing Engineering (PWK) |
Divisions: | Fakultas teknik Sipil dan Perencanaan > Teknik Perencanaan Wilayah dan Kota (PWK) S1 |
Depositing User: | Mr Sayekti Aditya Endra |
Date Deposited: | 17 May 2023 04:20 |
Last Modified: | 17 May 2023 04:20 |