JUNAIDI, AGNI PEMBAYUN HABIB (2026) MANAJEMEN RISIKO PADA PELAKSANAAN PEKERJAAN KONTRUKSI PEMBANGUNAN KANTIN DAN RUANG KELAS SMK SORE TULUNGAGUNG TAHAP 1. Tesis thesis, Institut Teknologi Nasional Malang.
Abstract
ABSTRAK Agni Pembayun Habib Junaidi, Program Studi Teknik Sipil, Program Pascasarjana, Institut Teknologi Nasional Malang, Agustus 2026, Analisis Manajemen Risiko Pada Pelaksanaan Pekerjaan Kontruksi Pembangunan Kantin Dan Ruang Kelas SMK SORE Tulungagung Tahap 1, Tesis, Pembimbing: ( I ) Prof. Dr. Ir. Sutanto Hidayat, MT., ( II ) Dr. Erni Yulianti, ST., MT. Dalam setiap pekerjaan konstruksi pasti terdapat suatu risiko, risiko merupakan suatu konsekuensi dari kondisi yang tidak pasti. Dalam suatu pekerjaan konstruksi ketidakpastiannya sangat besar karena tidak dapat diprediksi secara pasti berapa keuntungan atau kerugian yang akan diperoleh. Karena hal inilah maka perlu adanya manajemen risiko dari awal proyek konstruksi untuk mengurangi risiko dan dampak dari risiko yang mungkin akan terjadi. Penelitian ini bertujuan untuk mengetahui klasifikasi tingkatan risiko pada pelaksanaan pekerjaan kontruksi berdasarkan faktor-faktor sumber risiko yang dihadapi, untuk mengetahui faktor-faktor utama apa saja yang menjadi sumber risiko. Jenis penelitian ini berupa penelitian deskriptif analitik dengan menggunakan metode Principal Component Analysis dan Analisis AS/NZS 4360:2004 dari hasil pengumpulan data kuesioner. Hasil identifikasi menunjukkan terdapat 31 variabel risiko yang berpotensi memengaruhi pelaksanaan proyek. Berdasarkan analisis komponen utama, faktor risiko dominan meliputi keterlambatan material dengan nilai risiko 20 termasuk dalam risiko sangat tinggi, mobilisasi material dan alat ke lokasi yang sulit dengan nilai risiko 25 termasuk dalam risiko sangat tinggi, pekerja tertimpa material dengan nilai risiko 20 termasuk dalam risiko sangat tinggi, kurangnya tenaga kerja terampil dengan nilai risiko 16 termasuk dalam risiko tinggi, kedalaman pondasi tidak sesuai desain dengan nilai risiko 15 termasuk dalam risiko tinggi, serta beberapa risiko teknis lainnya. Kata Kunci : AS/NZL, manajemen risiko, PCA ABSTRACT Agni Pembayun Habib Junaidi, Civil Engineering Program Study, Postgraduate, National Institute of Technology Malang, August 2026, Risk Management Analysis in the Construction of the Cafeteria and Classrooms at SMK SORE Tulungagung Thesis, Adviser: (I) Dr. Ir. Sutanto Hidayat, MT, (II) Dr. Erni Yulianti, ST., MT. Every construction project involves some degree of risk, which is a consequence of uncertainty. In construction, uncertainty is particularly high because it is impossible to predict with certainty the profits or losses that will result. For this reason, risk management is necessary from the very beginning of a construction project to mitigate risks and minimize the impact of potential risks. This study aims to identify the classification of risk levels in construction projects based on the risk factors encountered, and to determine the primary factors that serve as sources of risk. This is a descriptive-analytical study that employs Principal Component Analysis and the AS/NZS 4360:2004 standard to analyze data collected through questionnaires. The results of the identification process indicate that there are 31 risk variables that could potentially affect project implementation. Based on the principal component analysis, the dominant risk factors include material delays with a risk value of 20, classified as very high risk; mobilization of materials and equipment to hard-to-reach locations with a risk score of 25, classified as very high risk; workers being struck by falling materials with a risk score of 20, classified as very high risk; a shortage of skilled labor with a risk score of 16, classified as high risk; foundation depth not conforming to the design with a risk score of 15, classified as high risk; and several other technical risks. Keywords: AS/NZL, risk management, PCA
| Item Type: | Thesis (Tesis) |
|---|---|
| Uncontrolled Keywords: | Keywords: AS/NZL, risk management, PCA |
| Subjects: | Engineering > Civil Engineering |
| Divisions: | Program Pasca Sarjana > Teknik Sipil S2 > Teknik Sipil S2(Tesis) |
| Depositing User: | AGNI PEMBAYUN HABIB JUNAIDI |
| Date Deposited: | 28 Aug 2026 05:07 |
| Last Modified: | 28 Aug 2026 05:07 |
| URI: | http://eprints.itn.ac.id/id/eprint/16505 |
Actions (login required)
![]() |
View Item |
