STUDI STATIC UNDER-FREQUENCY LOAD SHEDDING AKIBAT KONDISI TRANSIENT PADA SISTEM KELISTRIKAN PT. PETROKIMIA GRESIK

Priasmoro, Aga Dia (2017) STUDI STATIC UNDER-FREQUENCY LOAD SHEDDING AKIBAT KONDISI TRANSIENT PADA SISTEM KELISTRIKAN PT. PETROKIMIA GRESIK. Skripsi thesis, Institut Teknologi Nasional Malang.

[img] Text
Laporan Skripsi.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (4MB)

Abstract

ABSTRAK STUDI STATIC UNDER-FREQUENCY LOAD SHEDDING AKIBAT KONDISI TRANSIENT PADA SISTEM KELISTRIKAN PT. PETROKIMIA GRESIK Aga Dia Priasmoro, NIM : 1312023 Dosen Pembimbing I : Prof. Dr. Eng. Ir. Abraham Lomi, MSEE Dosen Pembimbing II : Dr. Irrine Budi Sulistiawati, ST, MT Suplai daya listrik pada pembangkit harus sama seiring dengan daya beban pada suatu sistem tenaga listrik. Munculnya gangguan pada sistem dapat mengakibatkan sistem mudah mengalami perubahan kearah transient. Salah satu gangguan yang dapat terjadi pada suatu sistem tenaga adalah lepas pembangkit, dimana akibat dari gangguan ini menyebabkan ketidakseimbangan daya pada sisi pembangkitan dan sisi beban sehingga berdampak pada penurunan frekuensi. Static under-frequency load shedding bertujuan mengembalikan nilai frekuensi kembali ke nilai yang diizinkan setelah terjadinya gaggguan diatas. Analisa ini dilakukan pada sistem kelistrikan PT. PETROKIMIA GRESIK, dimana gangguan lepasnya generator terjadi akibat short circuit tiga fasa pada bus petrokimia. Pada saat terjadinya gangguan tiga fasa pada bus petrokimia frekuensi naik mencapai 52,85 Hz.. Pada skenario 1 setelah dilakukan pelepasan pembangkit PLN frekuensi turun menjadi 48,74 Hz, sedangkan pada skenario 2 dimana PLN dan GTG lepas frekeunsi turun menjadi 41,75 Hz. Akibat lepasnya generator yang mangakibatkan penurunan frekuensi dilakukanlah load shedding, dimana berdasarkan perhitungan didapat waktu load shedding pada detik ke 2,44 dengan jumlah beban yang dilepas sebesar 8,429 MW untuk skenario 1, sedangkan pada skenario 2 load shedding dilakukan pada detik ke 2,050 dengan jumlah beban yang dilepas adalah sebesar 33,528 MW. Setelah dilakukan load shedding frekuensi sistem yang mulanya turun 48,70 Hz naik menjadi 49,5 Hz dengan prosentase kenaikan frekuensi sebesar 1,53 %, sedangkan pada skenario 2 frekuensi sistem yang mulanya 41,75 Hz naik menjadi 48,1 Hz dengan prosentase kenaikan frekuensi sebesar 15,20 %. Kata Kunci: Ketidakseimbangan Daya, Frekuensi, Static Under-frequency Load Shedding. iii ABSTRACT STUDY OF STATIC UNDER-FREQUENCY LOAD SHEDDING CAUSED OF TRANSIENT CONDITIONS AT PT. PETROKIMIA GRESIK ELECTRICAL POWER SYSTEMS Aga Dia Priasmoro, NIM : 1312023 Supervising Lecturer I : Prof. Dr. Eng. Ir. Abraham Lomi, MSEE Supervising Lecturer II : Dr. Irrine Budi Sulistiawati, ST, MT The power supply at the power plant has to be the same as the load on a power system. The emergence of disturbances in the system leads to the system easily towards transient. One of the disturbances occurred in a power system is the lost of power plant. This disturbance causes imbalance problems either in generator and load side, it caused decreasing frequency. Static under-frequency load shedding aims to return the frequency value back to the allowed value after the occurrence of the above disturbance. The analysis has been done on the electrical system of PT. PETROKIMIA GRESIK, where the lost of generator occurs due to a three-phase short circuit on the petrochemical bus 150 KV. At the time of disturbance in three phase of Petrokimia bus the frequency is raising up to 52,85Hz. In the first scenario where the power plant is release the frequency decrease up to 48,74 Hz, while in the second scenario where both PLN and GTG have released the frequency dropped up to 41,75Hz. Due to the frequency is decreasing while the generator is off. Therefore, load shedding is necessary. Based on the calculation in load shedding time on 2,44 seconds with the total load released is 8,429 MW in the first scenario. While in the second scenario the load shedding at 2.050 seconds. the total load need to shed is 33,528 MW. Where the load shedding is done the frequency has initially decreased to 48.70 Hz then increasing to 49,57 Hz with the percentage of rising frequency of 1.53%, whereas in the second case the frequency of a system is rising from 41,75 Hz to be 48,1 Hz with 15,20% of the rising percentage. Keywords: Unbalance power, Fequency, Static Under-frequency Load Shedding.

Item Type: Thesis (Skripsi)
Additional Information: Aga Dia Priasmoro, NIM : 1312023
Uncontrolled Keywords: Unbalance power, Fequency, Static Under-frequency Load Shedding.
Subjects: Engineering > Electrical Engineering
Divisions: Fakultas Teknologi Industri > Teknik Elektro S1 > Teknik Elektro S1(Skripsi)
Depositing User: Ms Nunuk Yuli
Date Deposited: 28 Aug 2019 06:37
Last Modified: 28 Aug 2019 06:37
URI: http://eprints.itn.ac.id/id/eprint/4069

Actions (login required)

View Item View Item