Comparing Between Production Scheduling Methods to Achieve Efficient Resource Utilization

Nursanti, Ellysa and Sibut, Sibut and Jayabalan, Sudharsan and Handoko, Fourry and Oktarina, Nindya (2020) Comparing Between Production Scheduling Methods to Achieve Efficient Resource Utilization. In: IPTEK Journal of Proceedings Series No. (1), 1 Februari, Institut Teknologi Sepuluh Nopember,.

[img] Text
3. Comparing_proceedings.pdf

Download (407kB)
[img] Text
Peer Review_Seminar Inter_Prooceed_Comparing Betw.pdf

Download (508kB)
[img] Text
Turnitin_Proceedings_Compar.pdf_pakai.pdf

Download (1MB)

Abstract

High competition among industries nowadays, requires companies to improve their production services. The speed of production service time, with excellent quality, becomes part of the company’s competitive advantage. This study aims to compare several production scheduling methods which are commonly used, so that efficient resource utilization can be obtained. Production Scheduling Methods such as Make to Order, Dannenbring, Branch and Bound, Nawaz Enscore and Ham and Campbell Dudeck Smith were compared using one case of tire retreading production. There were two jobs: tire retreading for truck and bus. Each job, assigned to ten workstations following its production steps. The results were obtained that Dannenbring and Campbell Dudeck Smith gave the same best results with the smallest makespan value, equivalent to 48% efficiency.

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: Branch and Bound, Campbell Dudeck Smith, Dannenbring, Nawaz Enscore and Ham, Production
Subjects: Engineering > Industrial Engineering
Divisions: Fakultas Teknologi Industri > Teknik Industri S1
Depositing User: Mr Sayekti Aditya Endra
Date Deposited: 15 Dec 2021 06:18
Last Modified: 15 Dec 2021 06:18
URI: http://eprints.itn.ac.id/id/eprint/5925

Actions (login required)

View Item View Item