Up a level |
Kartika, Deviany and Iskandar, Tiong and Wibawanto, Hadi Surya and Bangkit P, Wahyu (2021) ANALISIS PERKUATAN STRUKTUR PADA PROYEK RUKO DI PANGSUD GRESIK. ANALISIS PERKUATAN STRUKTUR PADA PROYEK RUKO DI PANGSUD GRESIK, 5 (2). pp. 48-55. ISSN 1979-2832
Hidayat, Sutanto and Iskandar, Tiong and Limpraptono, Yudi and Wijayaningtyas, Maranatha (2019) HEAVY EQUIPMENT EFFICIENCY, PRODUCTIVITY AND COMPATIBILITY OF COAL MINE OVERBURDEN WORK IN EAST KALIMANTAN. International Journal of Mechanical Engineering and Technology (IJMET, 10 (6). ISSN 0976-6359 (Submitted)
Purvitasari, Evi and Azis, Subandiyah and Iskandar, Tiong (2018) Evaluation of Factors Affecting the Delay in a Construction Project of Dr. Iskak’s Hospital Pavilion of Tulungagung District. International Journal of Scientific Engineering and Science, 2 (9). ISSN 2456-7361
NORFIRDAUS, NORFIRDAUS and Mulyadi, Lalu and Iskandar, Tiong (2017) Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda. Journal of Engineering Research and Application, 7 (9). ISSN 248-9622
Prihanto, Yulius Teguh and Azis, Subandiyah and Iskandar, Tiong (2017) Cost and Time Optimalization on the Implementation of Building Construction Project. European Researcher, 8 (3). ISSN 2219-8229
Iskandar, Tiong and Kartika, Deviany and Santosa, A.Agus (2017) STUDI OPTIMASI KUAT TEKAN PAVING BLOCK DENGAN MEMANFAATKAN LIMBAH PAVING BEKAS. Spectra, 15 (29).
Iskandar, Tiong and Kartika, Deviany and Santosa, A.Agus (2017) STUDI OPTIMASI KUAT TEKAN PAVING BLOCK DENGAN MEMANFAATKAN LIMBAH PAVING BEKAS. Spectra, 15 (29).
Mulyadi, Lalu and Iskandar, Tiong and Satriawansyah, Tri (2016) FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PELAKSANAAN PEKERJAAN PADA PROYEK PEMBANGUNAN GEDUNG BERTINGKAT DI KABUPATEN SUMBAWA NUSA TENGGARA BARAT. Jurnal Info Manajemen Proyek, 7 (2). ISSN 2460-9609
Santosa, A. Agus and Iskandar, Tiong and Kartika, Deviany (2015) Pendampingan Perencanaan Rumah Ibadah Di Desa Nangkajajar Kab. Pasuruan Sebagai Upaya Sharing Iptek dan Peningkatan Kenyamanan Warga Dalam Beribadah. SENATEK. ISSN 2407 – 7534
Mulyadi, Lalu and Iskandar, Tiong and Haryanto, Didik (2013) FAKTOR–FAKTOR YANG MEMPENGARUHI KEGAGALAN TUJUAN PEMBANGUNAN GEDUNG BERTINGKAT (STUDI KASUS: PEMBANGUNAN RUMAH SUSUN KALIGAWE DI SEMARANG). Jurnal Info Manajemen Proyek, 4 (1). ISSN 2460-9609
Mulyadi, Lalu and Iskandar, Tiong and Ardhana, Irwana (2011) FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PENERAPAN PEDOMAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA TENAGA KERJA KONSTRUKSI (STUDI KASUS PEMBANGUNAN PROYEK-PROYEK KONSTRUKSI DI KABUPATEN PENAJAM PASER UTARA). Jurnal Teknik Sipil INFO MANPRO, 2 (1).
Kartika, Deviany and Iskandar, Tiong and Wibawanto, Hadi Surya and Bangkit P, Wahyu (2021) ANALISIS PERKUATAN STRUKTUR PADA PROYEK RUKO DI PANGSUD GRESIK. In: UNSPECIFIED.