Up a level |
Purvitasari, Evi and Azis, Subandiyah and Iskandar, Tiong (2018) Evaluation of Factors Affecting the Delay in a Construction Project of Dr. Iskak’s Hospital Pavilion of Tulungagung District. International Journal of Scientific Engineering and Science, 2 (9). ISSN 2456-7361
Purvitasari, Evi (2018) EVALUASI FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG PAVILIUN RSU Dr. ISKAK KABUPATEN TULUNGAGUNG. Masters thesis, ITN Malang.