Up a level |
Wiharti, Wiwik (2022) RESCHEDULING PADA PROYEK GEDUNG SERBAGUNA PLBN ENTIKONG KALIMANTAN BARAT DENGAN METODE FAST TRACK. Skripsi thesis, ITN MALANG.
Wijayaningtyas, Maranatha and Nainggolan, Togi H. and Winanda, Lila Ayu Ratna and Wiharti, Wiwik (2022) PENERAPAN METODE SUBJEKTIF UNTUK MENGURANGI KECELAKAAN PEKERJA KONSTRUKSI. In: Seminar Nasional 2022 SEMSINA 2022 METAVERSE: Peluang Dan Tantangan Pendidikan Tinggi ISSN 2406-9051 Di Era Industri 5.0, 13 juli 2022, Malang.