IKHSAN, IKHSAN (2023) ANALISIS KEPUASAN STAKEHOLDER TERHADAP KINERJA KONSULTAN MANAJEMEN KONSTRUKSI PADA PROYEK REKONSTRUKSI JALAN DAN PEMBANGUNAN JEMBATAN KABUPATEN TRENGGALEK TAHUN 2022. Masters thesis, Institut Teknologi Nasional Malang.
Abstract
ABSTRAK Ikhsan, Program Studi Magister Teknik Sipil, Program Pascasarjana, Institut Teknologi Nasional Malang, September 2023, Analisis Kepuasan Stakeholder Terhadap Kinerja Konsultan Manajemen Konstruksi Pada Proyek Rekonstruksi Jalan Dan Pembangunan Jembatan Kabupaten Trenggalek Tahun 2022, Tesis, Pembimbing: (I) Prof. Dr. Ir. Lalu Mulyadi, MT, (II) Dr. Ir. Nusa Sebayang, MT. Proyek rekonstruksi jalan dan pembangunan jembatan Kabupaten Trenggalek pada tahun 2022 memiliki tingkat kompleksitas yang tinggi secara teknis dan non teknis, sehingga perlu ditugaskan konsultan manajemen konstruksi dengan harapan mendapatkan hasil sesuai rencana meliputi tepat mutu, tepat waktu, tepat biaya dan tertib administrasi. Namun kenyataannya masih ada kegiatan yang tidak sesuai dengan harapan karena kurangnya kinerja konsultan manajemen konstruksi. Kinerja inilah yang kemudian dijadikan dasar untuk mengukur kualitas pelayanan yang berpengaruh terhadap tingkat kepuasan dari stakeholder proyek. Sehingga penelitian ini dilakukan untuk menjawab sampai sejauh mana tingkat kepuasan stakeholder proyek terhadap kinerja konsultan manajemen konstruksi. Metode kualitatif yang digunakan pada penelitian ini adalah dengan mengidentifikasi variabel dan indikator kinerja konsultan manajemen konstruksi sedangkan metode kuantitatif yang digunkan pada penelitian ini adalah dengan penyebaran kuesioner kepada 58 responden dari unsur owner dan kontraktor untuk di analisis dengan metode customer satisfaction index (CSI) dan importance performance analysis (IPA). Dari hasil analisis kualitatif teridentifikasi 6 variabel dan 33 indikator yang berpengaruh terhadap kinerja konsultan manajemen konstruksi. Sedangkan hasil analisis customer satisfaction index (CSI) didapatkan nilai sebesar 63,80% yang berarti stakeholder merasa “cukup puas” terhadap kinerja konsultan manajemen konstruksi. Hasil importance performance analysis (IPA) dengan analisis gap dan tingkat kesesuaian keseluruhan didapatkan skor gap sebesar -54 dan persentase tingkat kesesuaian sebesar 77,58% yang berarti stakeholder merasa “tidak puas” dengan kinerja konsultan manajemen konstruksi. Sementara hasil importance performance analysis (IPA) dengan diagram kartesius digunakan untuk evaluasi terhadap indikator-indikator kinerja yang memiliki prioritas tinggi untuk ditingkatkan, dipertahankan, prioritas rendah untuk ditingkatkan, dan meningkatkan kepentingan. Kata kunci: kabupaten trenggalek, kepuasan stakeholder, kinerja, konsultan manajemen konstruksi ABSTRACT Ikhsan, Civil Engineering Masters Program, Postgraduate Program, National Institute of Technology Malang, September 2023, Analysis Of Stakeholder’s Satisfaction Level To The Work Performance From Construction Management Consultant On Road Reconstruction And Bridge Construction Project Of Trenggalek Regency In 2022, Thesis, Supervisor: (I) Prof. Dr. Ir. Lalu Mulyadi, MT, (II) Dr. Ir. Nusa Sebayang, MT. The road reconstruction and bridge construction project for Trenggalek Regency in 2022 has a high level of complexity whether in technical and in non-technical aspects, to make it necessary to assign a construction management consultant with expectation of getting the results according to plan, as characterized by having a right quality, time punctuality, cost-effective and orderly administration. Unfortunately, in reality, there are some activities which do not meet the expectations due to lack of work performance by the construction management consultant. This work performance then will be used as the basis for measuring the service quality which affects satisfaction level of the project’s stakeholders. Thus, this study was conducted to answer to what extent does the satisfaction level owned by the project stakeholders to the work performance of the construction management consultant. A qualitative method applied in this study was identifying the work performance variables and indicators from the construction management consultant, whereas quantitative method used in this study was distributing questionnaires to 58 respondents from the owner and contractor elements and analyzed by employing the Customer Satisfaction Index (CSI) and the Importance Performance Analysis (IPA) methods. From the quantitative analysis results, there are 6 variables and 33 indicators identified as influential factors of the work performance of the construction management consultant. While the result analysis of the Customer Satisfaction Index (CSI) obtained value of 63.80% meaning the stakeholders feel ‘quite satisfied’ with the work performance of the construction management consultant. The result of the Importance Performance Analysis (IPA) with gap analysis and overall suitability level obtained a gap score of -54 and a conformity percentage of 77.58% meaning the stakeholders are ‘dissatisfied’ with the work performance of construction management consultant. Then, the result of Importance Performance Analysis by a Cartesian diagram was used to evaluate any work performance indicator of which has high priority level to be improved, maintained, or low priority level to be improved and increase the importance. Keywords: trenggalek regency, stakeholder’s satisfaction level, work performance, construction management consultant.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Keywords: trenggalek regency, stakeholder’s satisfaction level, work performance, construction management consultant. |
Subjects: | Engineering > Civil Engineering |
Divisions: | Program Pasca Sarjana > Teknik Sipil S2 > Teknik Sipil S2(Tesis) |
Depositing User: | IKHSAN IKHSAN |
Date Deposited: | 27 Sep 2023 07:34 |
Last Modified: | 27 Sep 2023 07:34 |
URI: | http://eprints.itn.ac.id/id/eprint/13269 |
Actions (login required)
View Item |