ADI, SATRIO WIBOWO (2024) IMPLEMENTASI DAN EVALUASI MATURITAS PROSES KONSTRUKSI DAN PENGELOLAAN FASILITAS DENGAN MENGINTEGRASIKAN BUILDING INFORMATION MODELING (BIM). Masters thesis, Institut Teknologi Nasional Malang.
|
Text
Thesis Satrio Awal.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (1MB) |
|
|
Text
Thesis Satrio Bab 1.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (201kB) |
|
|
Text
Thesis Satrio Bab 2.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (365kB) | Request a copy |
|
|
Text
Thesis Satrio Bab 3.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (444kB) | Request a copy |
|
|
Text
Thesis Satrio Bab 4.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (2MB) | Request a copy |
|
|
Text
Thesis Satrio Bab 5.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (186kB) | Request a copy |
|
|
Text
Thesis Satrio Daftar Pustaka.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (303kB) |
|
|
Text
Thesis Satrio Lampiran.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (4MB) | Request a copy |
Abstract
ABSTRAK Satrio Wibowo Adi. Program Studi Magister Teknik Sipil, Program Pascasarjana, Insttut Teknologi Nasional Malang, Februari 2024. Implementasi dan Evaluasi Maturitas Proses Konstruksi dan Pengelolaan Fasilitas dengan Mengintegrasikan Building Information Modeling (BIM). Tesis. Pembimbing (1) Prof. Dr. Ir. Lalu Mulyadi, MT. (2). Ir. Maranatha Wijayaningtyas, ST., MMT., PhD., IPU. Salah satu teknologi yang dapat digunakan untuk memfasilitasi koordinasi yang lebih baik dalam proses konstruksi adalah Building Information Modeling (BIM). Penerapan BIM wajib diterapkan pada bangunan dengan kriteria luas diatas 2000 m2 (dua ribu meter persegi) dan diatas 2 (dua) lantai. Identifikasi masalah pada penelitian ini adalah terkait dengan kendala implementasi BIM pada proyek konstruksi dan mengetahui pengaruh Technology, Process, Policy, Capability, Organisational terhadap BIM pada proyek pembangunan Rusun Stasiun Rawabuntu. Sumber data yang digunakan dalam penelitian ini adalah data primer dan data sekunder. Data dikumpulkan melalui berbagai metode, termasuk wawancara dengan pihak-pihak terkait dalam proyek, observasi langsung, dan analisis dokumen proyek. Berdasarkan hasil evaluasi seluruh evaluator, model evaluasi maturitas digunakan untuk menilai kematangan BIM proyek dan implementasi konsep BIM menggunakan software Autodesk Revit. Selain itu regresi linier berganda digunakan karena kemampuannya untuk menganalisis hubungan yang kompleks antara satu variabel dependen dan beberapa variabel independen secara bersamaan, teknik ini efektif untuk menganalisis hubungan antara variabel dependen (BIM) dan beberapa variabel independen (Technology, Process, Policy, Capability, dan Organisational). Hasil yang diperoleh adalah (1). Pemodelan pada Building Information Modeling (BIM) merepresentasikan 2D dan 3D, 4D, 5D, (2). Quantity and Cost memiliki nilai tertinggi, menunjukkan awal yang baik dalam langkah optimalisasi implementasi BIM pada proyek Rusun Stasiun Rawabuntu. Berdasarkan hasil perhitungan regresi linier berganda diperoleh Technology, Process, Policy, Capability, Organisational baik secara simultan dan parsial mempengaruhi Building Information Modeling. Kata Kunci: BIM, Optimalisasi, Proses Konstruksi, Rusun Stasiun Rawabuntu. ABSTRACT Satrio Wibowo Adi. Study Program of Master of Civil Engineering. Institut Teknologi Nasional Malang. February 2024. Implementation and Evaluation of Construction Process Maturity and Facility Management by Integrating Building Information Modeling (BIM). Thesis. Advisors (1). Prof. Dr. Ir. Lalu Mulyadi, MT. (2). Ir. Maranatha Wijayaningtyas, ST., MMT., PhD., IPU. One example of technology that able to be used to facilitate better coordination within construction process is Building Information Modeling (BIM). Application of BIM is mandatory to be applied to non-simple state buildings with the criteria of an area of more than 2000 m2 (two thousand square meters) and having more than 2 (two) floors. The problem identified in this research is related to challenges of BIM implementation in construction projects and understanding the impact of Technology, Process, Policy, Capability, and Organisational factors on BIM in Rusun Stasiun Rawabuntu construction project. The data sources used in this research are primary and secondary data. Data were collected through various methods, including interviews with relevant parties in the project, direct observation, and document analysis. Based on the evaluation results from all evaluators, a maturity evaluation model was used to assess maturity of the BIM project, and implementation of BIM concepts was carried out using Autodesk Revit software. Multiple linear regression was used due to its ability to analyze complex relationships between one dependent variable and several independent variables simultaneously. This technique is effective in analyzing the relationship between the dependent variable (BIM) and several independent variables (Technology, Process, Policy, Capability, and Organisational). The results obtained are: (1) Modeling in Building Information Modeling (BIM) represents 2D and 3D, 4D, 5D. (2) Quantity and Cost dimension have the highest score, indicating a good start in optimizing the implementation of BIM for Rawabuntu Flat Tower Construction Project. Based on the results of the multiple linear regression calculations, it was found that Technology, Process, Policy, Capability, and Organisational factors both simultaneously and partially influence Building Information Modeling. Keywords: BIM, Optimalization, Construction Process, Flat Tower of Rawabuntu Train Station
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Keywords: BIM, Optimalization, Construction Process, Flat Tower of Rawabuntu Train Station |
| Subjects: | Engineering > Civil Engineering |
| Divisions: | Program Pasca Sarjana > Teknik Sipil S2 > Teknik Sipil S2(Tesis) |
| Depositing User: | SATRIO WIBOWO ADI |
| Date Deposited: | 09 Jan 2026 03:28 |
| Last Modified: | 09 Jan 2026 03:28 |
| URI: | http://eprints.itn.ac.id/id/eprint/15996 |
Actions (login required)
![]() |
View Item |