Analysis Of The Implementation Of Building Information Modeling For Time Control And The Implamation Methode Of Water Way Tunnel Construction In Way APU DAM, Buru District

Pangestu, Robi Siswo and Wulandari, Lies Kurniawati and Setyobudiarso, Herry (2020) Analysis Of The Implementation Of Building Information Modeling For Time Control And The Implamation Methode Of Water Way Tunnel Construction In Way APU DAM, Buru District. INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH, 9 (11). pp. 278-283. ISSN 2277-8616 56

[img] Text (Artikel)
3. Analysis-Of-The-Implementation-Of-Building-Information-Modeling-For-Time-Control-And-The-Implamation.pdf

Download (508kB)
[img] Text (Plagiasi)
4ANALY~1.PDF

Download (2MB)
[img] Text
peereview -Jurnal Analisys_Of_The Aplication035.pdf

Download (476kB)
Official URL: https://www.ijstr.org/final-print/nov2020/Analysis...

Abstract

The waterway tunnel construction work for the way apu dam is an underground work that includes several complex works, with the possibility that the fulfillment of the construction schedule may be delayed. On the other hand, there is information technology using Building Information Modeling (BIM) which can help smooth development. Researchers are interested in examining how the three building image modeling that has been given complete information can affect the implementation method and time control. The researcher formed a model 3 building image and filled it with detailed construction information, then from the 3-dimensional model image an analysis was made to improve the implementation method and time control analysis using the Network Planning Critical Patch method. By using this case study of the waterway tunnel construction , an acceleration of the provision of information is obtained to improve the implementation method and the spatial insight of the workplace to facilitate decision making. Controlling the implementation time by utilizing information from BIM resulted in an acceleration of the implementation completion time of 2 months from 12 months to 10, with a performance efficiency level of time control to 83.3%

Item Type: Article
Subjects: Engineering > Civil Engineering
Divisions: Program Pasca Sarjana > Teknik Industri S2
Depositing User: mr yudi yudi
Date Deposited: 07 Jul 2021 03:38
Last Modified: 12 Jul 2021 04:44
URI: http://eprints.itn.ac.id/id/eprint/5527