Up a level |
Azis, Subandiyah and Mundra, I Wayan (2020) Changes in government policies for regulating irrigation water in order to maintain food productivity. IOP Conf. Series: Earth and Environmental Science. ISSN IOP Publishing
Azis, Subandiyah (2020) Optimizing agricultural land area to increase productivity for anticipating decreasing irrigation water supply. IOP Conf. Series: Materials Science and Engineering.
Harjanto, Ruddy and Azis, Subandiyah and Hidayat, Sutanto (2019) THE ACCELERATING OF DURATION AND CHANGE OF COST ON CONSTRUCTION PROJECT IMPLEMENTATION. International Journal of Civil Engineering and Technology (IJCIET), 10 (1). ISSN 0976-6316
Azis, Subandiyah and Isman, R S and Agustina, S and Antoni, S and Setiawan, I and Purnawan, S (2019) Grain size parameter of sediment in Leupung Beach, Aceh Province. IOP Conf. Series: Earth and Environmental Science. ISSN IOP Publishing
Azis, Subandiyah (2019) Shifting cropping shifts by efficient irrigation water to produce maximum rice productivity. Shifting cropping shifts by efficient irrigation water to produce maximum rice productivity. pp. 1-9.
Azis, Subandiyah and Putranto, Edi Hargono D. and Safi'i, Ali (2018) ANALISARISIKO PENAWARAN UNDERESTIMATE TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI KABUPATEN PROBOLINGGO. ANALISARISIKO PENAWARAN UNDERESTIMATE TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI KABUPATEN PROBOLINGGO (13). pp. 1-13.
Tanojo, Frans Himawan and Hidayat, Sutanto and Azis, Subandiyah (2018) The Analysis Of Risk Management Implementation On Hospital Construction Project; Penulis: Frans Himawan Tanojo, Sutanto Hidayat, Subandiyah. International Journal of Civil Engineering and Technology (IJCIET), 9 (7). pp. 574-583. ISSN 0976-6316
Purvitasari, Evi and Azis, Subandiyah and Iskandar, Tiong (2018) Evaluation of Factors Affecting the Delay in a Construction Project of Dr. Iskak’s Hospital Pavilion of Tulungagung District. International Journal of Scientific Engineering and Science, 2 (9). ISSN 2456-7361
Azis, Subandiyah (2018) Optimization of the Combination of Heavy Equipment Use in Land-Filling Work in Terms of Time and Cost in the Construction Project of Job Training Center at Ende District of East Nusa Tenggara. Optimization of the Combination of Heavy Equipment Use in Land-Filling Work in Terms of Time and Cost in the Construction Project of Job Training Center at Ende District of East Nusa Tenggara, 2. pp. 16-25. ISSN 2456-7361
Kustamar, Kustamar and Azis, Subandiyah and Nurtanto, Hepi (2018) PENENTUAN SKALA PRIORITAS PEMILIHAN PERKERASAN PENINGKATAN JARINGAN JALAN DI PROPINSI KALIMANTAN UTARA DENGAN AHP. Jurnal Info Manajemen Proyek, 3 (1). ISSN 2460-9609
Kustamar, Kustamar and Azis, Subandiyah and Tantri, Anton (2017) ANALISIS PENGAMBILAN KEPUTUSAN PENGOLAHAN LIMBAH CAIR BAGI INSTITUSI PELAYANAN MEDIS DI SEKITAR KALIMAS SURABAYA. Jurnal Info Manajemen Proyek, 8 (1). ISSN 2460-9609
Iswahyudi, Bobi Eko and Azis, Subandiyah and Santosa, Andrianus Agus (2017) ANALYSIS OF CONSTRUCTION COST EFFICIENCY BETWEEN PRECAST METHOD AND CONVENTIONAL METHOD IN BUILDING PROJECT. International Journal of Technology and Sciences (IJTS), 1 (1). ISSN 2597-3711
Prihanto, Yulius Teguh and Azis, Subandiyah and Iskandar, Tiong (2017) Cost and Time Optimalization on the Implementation of Building Construction Project. European Researcher, 8 (3). ISSN 2219-8229
Azis, Subandiyah (2017) Mudflow Utilization for Construction Materials of Tertiary Irrigation Canal Lining. Mudflow Utilization for Construction Materials of Tertiary Irrigation Canal Lining (6). pp. 1-6.
Azis, Subandiyah and Kustamar, Kustamar (2017) Mudflow utilization for construction materials of tertiary irrigation canal lining. AIP Conference Proceedings, 1903 (070003). ISSN 1903, 070003 (2017)
Azis, Subandiyah (2017) OPTIMASI DAN EVALUASI PEMBANGUNAN PERUMAHAN PURI KARANG MULYO RESIDENCE DENGAN MENGGUNAKAN METODE SYMPLEKS DAN QM FOR WINDOWS VERSI 2.0. OPTIMASI DAN EVALUASI PEMBANGUNAN PERUMAHAN PURI KARANG MULYO RESIDENCE DENGAN MENGGUNAKAN METODE SYMPLEKS DAN QM FOR WINDOWS VERSI 2.0, 8 (11). pp. 1-11.
Azis, Subandiyah and Candrasari, Lia and Hidayat, Sutanto (2017) Optimization of Rescheduling and Economy Analysis of the Implementation of Kwitang Office Park Building Constructio n Project in Jakarta. Contemporary Engineering Sciences, 10 (7).
Hidayat, Sutanto and Azis, Subandiyah and Suwignyo, Suwignyo and Mulyadi, Lalu and Kustamar, Kustamar (2017) Strategy of infra-structure development on junction road network in Karanglo for handling congestion of Lawang-Malang-East Java province of Indonesia. Contemporary Engineering Sciences, 10. pp. 335-343. ISSN 13147641
Azis, Subandiyah (2016) ANALISIS FAKTOR-FAKTOR KINERJA KONSULTAN PENGAWAS YANG BERPENGARUH TERHADAP WAKTU DAN MUTU PEKERJAAN PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO. ANALISIS FAKTOR-FAKTOR KINERJA KONSULTAN PENGAWAS YANG BERPENGARUH TERHADAP WAKTU DAN MUTU PEKERJAAN PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO, 7 (12). pp. 1-12.
Azis, Subandiyah and Putranto, Edi Hargono D and Sudarmono, Sudarmono (2016) ANALISIS YANG MEMPENGARUHI KINERJA KONTRAKTOR TERHADAP KUALITAS PROYEK-PROYEK PENINGKATAN JALAN DI KABUPATEN PROBOLINGGO. Jurnal Info Manajemen Proyek, 7 (2). ISSN 2460-9609 (Submitted)
Azis, Subandiyah and Nurdin, Ali and Putranto, Edi Hargono D. (2016) Application of value engineering on the contruction of tertiary Irrigation channel. Research Journal of applied sciences. ISSN 1819-932X (Submitted)
Azis, Subandiyah and Widodo, Hari (2016) DETERMINATION OF PRIORITY OF THE CONSTRUCTION OF IRRIGATION NETWORK. International Journal of Agricultural Research, Innovation and Technology, 6 (2). ISSN 2224-0616
Azis, Subandiyah (2016) Environmental Drainage Systems in the Sukun District, Malang Indonesia. International Journal of Innovations in Engineering and Technology (IJIET), 7 (4). ISSN 2319 - 1058
Hirijanto, Hirijanto and Azis, Subandiyah and Hargono, Edi and Hidayat, Ibnu (2013) METODE GLOBAL PLANTASION SISTEM UNTUK ANTISIPASI DAMPAK PERUBAHAN IKLIM (KAJIAN DAERAH IRIGASI MOLEK KABUPATEN MALANG) (220A). Konferensi Nasional Teknik Sipil 7.